Aspen (East London)  
Two projects were recently undertaken by Anderson Engineering for Aspen, East London.

Details of the Projects

Project 1: The low bio burden project consolidated the semisolid ointments and creams equipment into a new facility. The fully automated contramix vessels with raising/lowering capabilities were designed with functionality which includes full vacuum, overpressure with contrarotating stirrers

and emulsifiers for which all internal components had to be mirror polished. (A first for us!)

The associated equipment with this plant included a premix wax melting vessel with additional mobile vessels, storage tanks and a comprehensive automatic Cleaning In Place (CIP) system.

This was a very technical project where installation and commissioning deadlines were tight.
Manufacturing

3000 l Hot water tank with vacuum pump


1250 l Contramix vessel
raise/lower being tested

750 l Portable storage vessel
- finishing touches

700 l Wax melter grid


Emulsifier - premix tank

750 l Contramix ingredient inlet funnel

750 l Portable storage vessels
completed

Wax melters / portable storage /
contramix - testing motors / clamp rings
Complete

Pressure testing dimple jacket of
contramix vessel

1250 l Raise/lower contramix vessel


750 l Portable storage vessel with
product

750 l Portable storage vessel in
wash bay

750 l Contramix vessel anchor stirrer

1000 l Wax melter

Contramix vessel scraper blades


750 l Raise/lower contramix vessel

Project 2: The process is totally batch orientated with five main manufacturing vessels utilising a combination of pressure, vacuum and mixing capabilities. This is a flame proof installation as the manufacturing process includes the processing of alcohol. There is a comprehensive automatic CIP system.

 

Overall
The electric and control philosophy required the extensive use of Programmable Logic Controller (PLC). The projects were subject to full pharmaceutical documentation requirements and had to undergo 100% scrutiny and audit for all the materials of construction, calibration and test certificates. As these were turnkey projects, the building infrastructure was in place but all rigging, installation of plant, pipework and electrical installation was undertaken by Anderson on extremely tight deadlines.
"We brainstorm excellent, practical solutions and enjoy open communications. Anderson delivers what we require. It was a requirement that you supply the correct documentation, and we were impressed by your willingness and the resources that you put in place,"
- Mike Reed, Aspen (East London).
Manufacturing

3000 l Manufacturing vessel on cradle
ready for transport

1500 l Manufacturing
vessel cleaned and completed

500 l Cold water tank
cleaned and complete

CIP system pipework - factory set up

back

Complete


1500 l Portable storage vessels completed,
ready for factory acceptance test


1500 l and 500 l Portable storage vessels
ready for factory acceptance test

100 l Mobile premix tanks ready for
factory acceptance test

Tanks loaded on truck ready for
transport